What is a cost roll-up?

How a cost roll-up builds a product's cost from its bill of materials, and why it differs from the actual cost of a production run.

Updated

In short

A cost roll-up adds a product's component costs, scrap and extra costs from its BOM into a standard cost per unit. SimpleERP shows a live roll-up on every BOM at current average costs.

A cost roll-up calculates what one unit of a manufactured product should cost by adding up its bill of materials: each component's quantity, raised for scrap, times its current cost, plus labour and overhead per batch, divided by the batch size. The result is a standard cost used to set prices and to compare against the actual cost of each production run.

Cost roll-up: a worked example

Standard cost per unit = (Σ component qty × (1 + scrap %) × average cost + extra cost per batch) ÷ batch size. For Lakshmi Steel's Steel rack 4 shelf:

ComponentQty per 10 racksScrap %Planned qtyAverage costCost
Slotted angle 6 ft40 Nos0%40 Nos₹310₹12,400
Shelf panel 36 × 18 in40 Nos2.5%41 Nos₹290₹11,890
Nut and bolt set320 Nos0%320 Nos₹2₹640
Powder coat paint4 kg5%4.20 kg₹450₹1,890
Material cost₹26,820
Labour and power per batch₹4,380
Standard cost per rack₹31,200 ÷ 10 = ₹3,120
Steel rack 4 shelf, BOM version 1: the recipe for 10 racks.

The rack sells at ₹4,990 before GST, so the standard margin is ₹1,870 a rack. The last work order came in at ₹3,127.10, ₹7.10 over standard, mostly from two extra dented panels.

FAQ

Questions, answered

What is the difference between standard cost and actual cost?

Standard cost is what the BOM says one unit should cost at today's prices. Actual cost is what a real run cost, from what it consumed. The gap points to waste, price changes or a BOM that needs updating.

Why does the roll-up change when I have not touched the BOM?

Because it uses current average costs. A new bill for shelf panels at a higher rate raises the average, and every BOM using panels shows a higher standard cost straight away. That is the point: it reflects what the next batch will cost.

Does the roll-up include labour?

Only what you put in the BOM's extra cost per batch. Add wages and power for one batch there. Without it the roll-up shows material cost only, which understates the cost of the product.

How do I use cost roll-up for pricing?

Start from the standard cost per unit, add your target margin, then check the market price. If the roll-up says ₹3,120 and buyers pay ₹4,990, you know the margin before quoting. Recheck after any big raw material price change.